How it works

A new door, from the measuring visit to the day it goes in

Why the opening is measured before anything is priced, what the contract holds, what happens on the day, and what is left to an electrician.

AI-generated illustration. Not a real home or business.

From measuring to the day, in six steps

  1. Measured first

    A new door is measured first: the opening, the headroom above it, the room at the sides and back to the wall, and the frame it fixes to. The measuring visit costs nothing, and you don't have to sign anything after it.

  2. A written contract

    The door, its size, the springs, the opener if there is one, the price itemized, the dates and how you pay, with the notices the law requires.

  3. Three business days

    You can cancel until midnight of the third business day after signing. Nothing is ordered before then.

  4. The day

    The old door's spring tension is released by the crew before anything is taken down, the old door goes, the new tracks, door and springs go up, and the door is balanced.

  5. The opener, if there is one

    Hung, connected, and its sensors set; the reversing test is run with you watching.

  6. Paying

    After the door is in and works, from the contract.

Before the order

Why a door is measured first

A sectional door does not hang in its opening the way a house door does. It rides up on two tracks and rolls back under the ceiling, so it needs room above the opening for the springs and the curve of the tracks, room at each side for the upright tracks, and room behind it for the whole door to lie flat when it is open.

Priyanka Halvorsen-Mbeki measures openings for new doors and orders them. She measures the headroom twice, because a door that does not fit the space above it does not fit. She orders a door only after the three days to cancel are over.

Every door is made to its size, which is why nothing is ordered from a width given over the telephone.

A worked example: a symptom check

A new two-car door with an opener A two-car door under a detached house in Bayside

The eight answers behind it
What do you need?
A new garage door
Where is the house?
Elsewhere in Queens
Do you own the house?
Yes, I own it, alone or with someone
What kind of house is it?
A detached house, one home
How wide is the door?
Two cars wide, about sixteen to eighteen feet
With a new opener as well?
Yes, with a new opener
Where would the opener go?
On the ceiling, with a rail to the door
Is there an electrical outlet where the opener would go?
Yes, there is an outlet there

Price range at our published prices

  • A new insulated steel sectional door, installed, the old one taken away$2,350 to $2,750
  • A new ceiling opener with a belt rail, installed$625
  • The price range, before tax$2,975.00 to $3,375.00
  • No sales tax on a new door or opener installed, with New York's capital improvement certificate.
  • The price range, with tax$2,975.00 to $3,375.00

The published price, measured first. A written contract is signed before anything is ordered, and nothing is ordered until the three business days to cancel are over.

The symptom check's answer to these questions, at the published prices. Nobody has seen your door.

The prices

Every repair has a published price for a one-car door and for a two-car door, and it is the whole price of the job: there is no call-out or visit charge on top. The first visit costs nothing, and you don't have to sign anything after it. Sales tax is worked out line by line.
The pricesOne-car doorTwo-car door
A complete new door or a complete new opener installed is a capital improvement: no sales tax is charged on that line when you sign New York's capital improvement certificate, Form ST-124, which you sign and give to the company with the contract.
A new ceiling opener with a belt rail, installed$625$625
A new wall-mounted opener, installed$950$950
A new insulated steel sectional door, installed, the old one taken away$1,650 to $1,950$2,350 to $2,750

Every published price

How long it takes, and when the crew comes

A new door is made to its size and usually arrives two to four weeks after the contract is signed and the three days are over. It is installed in a day, the old door and its springs taken away the same day.

Technicians visit from 8 am to 5 pm, Monday to Saturday. There is no night or Sunday service, and no promise of an arrival time: the office gives you a window when it books the visit.

Tomasz Okonjo-Reyes leads the crew that takes old doors away and puts new ones in. He checks the new door's balance with the springs set before the opener is connected. He leaves the garage swept, with the old door already on the truck.

The opener's outlet

A new opener plugs into an outlet near where it is mounted, on the ceiling for a rail opener or on the wall beside the door for a wall one, never into an extension cord. If there isn't one, a licensed electrician adds it before the opener goes up: that is electrical work, with its own permit, and this company does not do it.

Permits, and the wind load

Replacing a garage door in the same opening needs no Buildings permit. Widening an opening or building a garage does, and that is not something this company takes on. Every New York City contract comes with a signed notice saying whether any permit is needed.

New York City's Building Code requires a garage door to be tested for the wind it will face; a new door's maker states its rating, and the contract names the door by make and model.

Before a new door goes in

  1. Empty the garage's front few feet and the wall above the door.

  2. Leave room on the driveway or the curb for the new door's sections.

  3. Have an outlet near where the opener will hang, or ask a licensed electrician to add one before the day.

  4. Plan to be without the garage for most of the day.

  5. Keep pets and children away while the old door comes down.

Check your door